Home arrow Case Studies arrow Carlsberg Tetley
Northern Doors (UK) Ltd
Kingsforth Road, Thurcroft,
Rotherham,
S66 9HU,
South Yorkshire,
United Kingdom

Telephone: 44 1709 545999
Fax: 44 1709 545341
This email address is being protected from spam bots, you need Javascript enabled to view it
www.northerndoors.net
Carlsberg Tetley

 

Contractor  Holroyd Construction
Architect
Nuttall Yarwood & Partners
Value
£115,000.00

 

 A significant growth in Carlsberg's share in the UK beer market and to cope with demand during the 2006 World Cup resulted in capital investments to the Leeds brewery to increase ‘small pack' (bottles) packaging capacity.

Northern Doors were awarded the contract to supply and install a complete package of 9no. Mavifold High-Speed Fold Up doors, 9no. Sectional Overhead doors, 5no. Safeguard, 76 Roller Shutters, 15no. Steel Hinged Fire Exit Doors, 3no. 2 hour Fire Resistant Steel doors, 1no. Norfydor 2 hour Fire Resistant Roller Shutters.

Some of the Mavifold High-Speed doors were fitted to the bottling conveyor system. These doors were interlocked with the conveyor to sense when a pack of bottles approaches. The door opens and closes after the bottles travel through the opening to the dispatch area.


 

 
< Prev   Next >
© 2008 Northern Doors
Joomla! is Free Software released under the GNU/GPL License.